On L0 please explore a corridor(Draft Lobby) to connect the technical workshop located on the west. We are allowed to have a draft lobby so we should make use of it.
Installations can go on a different floor.
Keep the lobby area free and the Gallery 100 can go on the second floor.
We have too much technicals on the South, try to push the library there to connect to Saaret.
On this level there's an important setback of the facade on the West side of the building.
On L3 your slab is from a very old model. I have increased that area and added a clear connection to the outdoor roof terrace. The space there is around 4m high: please see the image.
The circulation of the public follows a clear loop