On L0 please explore a corridor(Draft Lobby) to connect the technical workshop located on the west. We are allowed to have a draft lobby so we should make use of it.
Installations can go on a different floor.
Keep the lobby area free and the Gallery 100 can go on the second floor.
We have too much technicals on the South, try to push the library there to connect to Saaret.
On this level there's an important setback of the facade on the West side of the building.